The end of the school year is always busy for the LeGrow tribe and we've fallen behind on the blog (fortunately the work on the house has continued!). There's been a lot going on over the last two week. The windows have gone in (they look great!). The electrician has finished all of the wiring, he installed the can lights and has done all the low voltage: internet, phone, cable, more internet, security and speaker wires - Ian might have gone overboard on the CAT6 for the internet! Poor electrician, we had a lot of requests along the way and asked for more lights after he was done - this was really hard to visualize in advance. The plumber finished all the pipes and attached the valves in the showers. The heating guys also finished up with the furnace. Pretty much everything in the walls is done, we're almost ready for the insulation and sheetrock! Some bonus photos below of Kyle & Chloe as well.
|
AuthorA stay-at-home mom with an amazing husband, 2 talented teenagers, and a crazy little dog. Archives
August 2013
Categories |