Week 9

5/27/2013

 
Picture
Visible changes are slower this week (last week as I'm a little behind!) as it is mainly the subcontractors doing their work. Electrical has been out all week drilling holes, running wire and putting up plug & switch boxes. Often we see new plumbing too!
We picked up the boat and spent a day installing bumpers on the dock edge to protect our new investment. We've managed to go out a few times but the weather hasn't been very co-operative. Check out the photo of Ian at the end of the blog.

Here's a flashback shot from Kyle's bedroom. The one on the left is from the first week of demolition back in March, note the brick chimney and the stairs. Now the chimney is long-gone, the stairs have been turned and almost all the framing is new. You can also see the new heating ducts in the ceiling and the trench in the floor that contains the new plumbing.
Picture
Picture
Here is Ian installing bumpers along the edge of our dock. Our first docking experience was a little hairy as it was a little windy. Too much stress for us - a little protection made subsequent landings a breeze, well almost...we may have still provided some entertainment for anyone watching!
Picture

Time for a little fun!

5/17/2013

 
We started looking at boats last summer. We looked at several brands and models and after seeing it at the boat show in March, we decided on the Cobalt 200. It is just the right size for our lift, has a great seating layout, and drives beautifully on the water. Last week they brought it out for a test drive (how's that for service!), then they brought it back on Wednesday so we could test out our boat lift (we were a little worried that the 13 year-old lift might not be up to the task!). It went up with no problem so we closed the deal today!
Picture
Picture

Week 8

5/12/2013

 
Another week of work at the house, it is exciting to see the progress, we are still heading out a few times a week to see what is going on. The furnace guy worked fast - in two days he installed the furnace and duct work (I think he was heading out to Hawaii on day 3!). The main duct line runs through the crawl space and saves us a lot of head room on the lower level. The plumber continues to be in and out adding waste water pipes. We've been spending time at tile showrooms selecting tiles and counter samples for our architect to review. It's a slow process but we are narrowing it down and beginning to make progress. We settled on dark sapele wood for the kitchen cabinets and a natural sapele for the master bath. Our tile and counter tops will be neutral.

Week 7

5/8/2013

 
The framing continues...our pantry and staircase half wall were some of the biggest changes. The weather was so beautiful on the weekend, we couldn't stay away and spent time on the water in our kayak. Our crazy little dog hates getting in the water but loves riding along with us!
Picture
The door to our pantry and the half wall which will allow sunlight to flow from the hall skylight into the kitchen.
Picture
Out on the water with Ian and our little Lucas!
Picture
The sun really shines in the house in the late afternoon. This photo was taken from the front door.
Picture
A view of our house and dock taken from the water. The garden has lots in bloom this time of year.

    Author

    A stay-at-home mom with an amazing husband, 2 talented teenagers, and a crazy little dog.

    Archives

    August 2013
    July 2013
    June 2013
    May 2013
    April 2013
    March 2013

    Categories

    All
    Remodel

    RSS Feed

legrow.org
  • Home
  • Blog
  • 50