Visible changes are slower this week (last week as I'm a little behind!) as it is mainly the subcontractors doing their work. Electrical has been out all week drilling holes, running wire and putting up plug & switch boxes. Often we see new plumbing too!
We picked up the boat and spent a day installing bumpers on the dock edge to protect our new investment. We've managed to go out a few times but the weather hasn't been very co-operative. Check out the photo of Ian at the end of the blog.

Here's a flashback shot from Kyle's bedroom. The one on the left is from the first week of demolition back in March, note the brick chimney and the stairs. Now the chimney is long-gone, the stairs have been turned and almost all the framing is new. You can also see the new heating ducts in the ceiling and the trench in the floor that contains the new plumbing.
Picture
Picture
Here is Ian installing bumpers along the edge of our dock. Our first docking experience was a little hairy as it was a little windy. Too much stress for us - a little protection made subsequent landings a breeze, well almost...we may have still provided some entertainment for anyone watching!
Picture

Comments are closed.

    Author

    A stay-at-home mom with an amazing husband, 2 talented teenagers, and a crazy little dog.

    Archives

    August 2013
    July 2013
    June 2013
    May 2013
    April 2013
    March 2013

    Categories

    All
    Remodel

    RSS Feed

legrow.org
  • Home
  • Blog
  • 50