Week 3 - Part II

4/6/2013

 
After much discussion and several attempts to locate the sewer line from above ground, our excavation crew finally dug down and found it! The line was about 12 ft from our patio and over 5 ft away from the closest guess. The crew did an awesome job replacing the whole line and  then restoring our retaining wall, flagstone path and flower beds. We think it looks better than before :)
Picture
BEFORE - The sewer line under construction
Picture
AFTER - better than before!!