Week 5 - Flashback

4/20/2013

 
Here's a look back a few weeks to the end of March when the demolition had just begun. Notice the new beams, walls and changes to the chimney and stairs.
Picture
Picture

Week 5

4/18/2013

 
Big news for this week is the new foundation wall outside - our mini-addition (all 30 sqft of it) has started. Progress inside has been a little harder to see this past week, we're waiting for the plumber on the lower level so not too much has changed down there. Demo has continued upstairs - the old bathrooms and closet are completely gone and we're right down to the 60-year-old floor boards. Take a close look at floor in the pictures, in several of the shots you can see right through to the lower level... I had to tip-toe around so I didn't fall through!

Week 4

4/10/2013

 
Lots of exciting changes today when we toured the house. It is so much fun to see it all taking shape after so many months of planning and dreaming... We spent several hours yesterday touring kitchen and bathroom showrooms, faucets, sinks, toilets, shower heads, all the exciting stuff!
After a busy afternoon we came home to find Kyle had decided to make us all dinner!
Picture
Chef Kyle prepares the Grand Marnier Prawns
Picture
The complete meal - Bruschetta, Potatoes au Gratin and the Prawns

Week 3 - Lower Level Tour

4/8/2013

 
I'm trying something new here - an embedded 360-degree Photosynth of the lower level. Click the image below then drag your mouse around to tour the rooms. You can also go full screen by clicking the button on the image. Let me know how it works!

Week 3 - Part III

4/7/2013

 
Friday was an exciting day at the house. Our vision for the staircase began...the old staircase was moved into the new position. It's a temporary fix since the new staircase will be slightly wider but it gives us an idea of what it'll look like. It looks AWESOME!
The renovation is more extensive than we'd originally imagined. As you can see from the photo of Ian's workshop, we went right down to the concrete walls. In the case of Kyle's room, we went right through the concrete!
Picture
This corner is where Ian' workshop will go, the framing has started.
Picture
Down to the concrete and beyond - this dirt hasn't been seen in 60 years! Kyle's room is always a mess!

Week 3 - Part II

4/6/2013

 
After much discussion and several attempts to locate the sewer line from above ground, our excavation crew finally dug down and found it! The line was about 12 ft from our patio and over 5 ft away from the closest guess. The crew did an awesome job replacing the whole line and  then restoring our retaining wall, flagstone path and flower beds. We think it looks better than before :)
Picture
BEFORE - The sewer line under construction
Picture
AFTER - better than before!!

Flashback

4/5/2013

 
Quick flashback to last year - things are starting to look a little different. The kitchen is still in a box, but not for long... the fireplace is gone, stairs will be moved soon too.
Picture
Here's how the Kitchen & Great Room looked a year ago when we first toured the house.
Picture
Things looks a little different this week!

Week 3

4/3/2013

 
The weather was beautiful over the weekend - spring has definitely sprung. The garden is starting to bloom, check out the photo of our Magnolia tree. The 5 of us spent Easter Sunday doing some yard work; well 3 of us worked and 2 of us slept! Chloe did manage to do some homework after her nap but then it blew into the lake! A very nice man in a kayak retrieved it for her on his way past. Ian and Kyle relocated the grape arbor to get it out of the way of construction and Kyle and I trained the climbing roses to climb their arbor.
Construction continues - the central beam was removed and a temporary wall was installed to hold up the rest of the house. Demolition was also continuing on the fireplace, it was reduced to a small pile of rubble. The poor guy had to carry it all out by had, they filled up two 8 ton dumpsters with bricks and concrete!

It turns out that when a house is built by the owner (in the 1950's anyway) that you can be creative with your construction techniques. The front steps were solid concrete! And in the house, the upper floor support posts holding up the roof were just resting on the floor, there weren't any supports underneath on the lower floor bearing the weight! These all had to be added to bring the house up to code - see the huge beams in the pictures and the new support posts.

We also found the elusive sewer pipe - an excavation crew was out to relay the sewer line for the house, it was several feet away from where the city thought it was.

Week 1 & 2

3/28/2013

 
Picture
Work has finally begun inside the house! After taking turns camping out at the permit office, we finally got our building permit and the contractors moved in. It's only been two weeks but look at the destruction 2 men with jackhammers can do...

They started in the basement - first tearing down the walls, then tearing up some of the floor (5" of concrete!) to get ready to lay down the pipes for the kids' bathrooms.

Almost ready to start!

3/15/2013

 
While awaiting the permits, we got our own dumpsters and a honey bucket!
<<Previous
Forward>>

    Author

    A stay-at-home mom with an amazing husband, 2 talented teenagers, and a crazy little dog.

    Archives

    August 2013
    July 2013
    June 2013
    May 2013
    April 2013
    March 2013

    Categories

    All
    Remodel

    RSS Feed

legrow.org
  • Home
  • Blog
  • 50